One of the many things we love about our boat is her ability to host up to 6 people and absorb all their things. However, it became apparent to us when the Neely family visited for our Santa Cruz Island sail that our quarter berth(s) was not the comfiest sleeping arrangement. You see, our quarter berth was a double bunk, meant for crew while underway which is great but we didn’t see ourselves hosting 4 single people at once… which means there was no need for the quarter berth to be offset. So circling back to when the Neely’s came to stay, Jon and Shannon (who we shall refer to as SV Prism) had to sleep bunk style while momma Neely slept in the V-berth. When they left we promised ourselves that our next “big project” priority would be constructing a raised platform to turn our bunks into a (sorta) queen sized bed so a couple could cuddle comfortable (try saying that 3 times fast!) We finally got around to the refit when my parents planned a visit. Now I will pass off the blog to Chris who can give you all the details. Cheers, ~ Marissa

SAM_4626
Before the reft

 

Hi everyone! Chris here. Let’s dive right in: the first thing we had to do was take out all the cushions then disassemble the upper bunk starting with the large teak beam which provided a lip along upper level. I knew right from the start that this piece of teak was going to be reused in some way to build up our nav station so we were extra careful not to harm the wood in any way. Once we carefully took out all the teak bungs (or plugs) and screws holding it in place it popped off no problem.

Right after that, I had a classic “while I was in there” moment and cleaned out the locker that was underneath the lower bunk and repainted using good ol’ white rustoleum. I did this to all four existing lockers before moving onto the next part of the project which turned out to be a project in itself (go figure!)


 

 

Our battery charger was attached to the bulkhead separating the lazaret and the cabin which is fine, however it was always in sight and I really hated looking at it all the time so we decided to move it into our dedicated Electronics Locker (which also doubles as Marissa’s overflow closet… she’s working on the whole “downsizing” thing). Moving the battery charger meant moving all the wires that connected the charger to our batteries, along with relocating a 110v plug into the locker, so it can be neatly found all in one place. During this seemingly little relocation, I removed an old hanging plug that belonged to the old inverter that powered the entire 110 side of our boat when we are not plugged into land, but when we bought the boat one of the first things I got rid of was the very old and crusty inverter that sounded like it would blow when I flipped it on.

I’m not sure if you can tell, but I really like things to be done correctly and neatly so when I start one project, I’m bound to dabble in 13 others in order to consider the job truly done. So back to me struggling to rewire: long story short I called my brother to help me figure out what wire was what since we found one 4-plex wire that should not have been in a 110 system. After much thought and careful experimentation, we found that the wire only daisy chained into our room and stopped there. I finally felt much more comfortable with our 110 system. Another little tidbit about my personality: I feel much more confident in something if I have completely torn it apart and correctly put it back together again. This method (although time consuming) gives me peace of mind when I use these systems daily.

IMG_6374.JPG
The battery charger in its new electronic locker home… mid-painting

While I was in the electronic locker the paint was also crap so I got out my tools to strip to fiberglass again before putting two coats of paint on. This made the locker smell all better (it was a little musky in there) and Marissa appreciated because some of her clothes share this locker (like I said, she is working on downsizing). The floor in this locker was badly rotten from getting wet at some point in time this is also where we had our 2nd battery bank for starting the engine and when we bought the boat this one battery was expanding, getting super super hot and oozing battery acid (FUN!!) but when I took the battery out some 6 months ago I didn’t have the chance to fix the gross floor, so with the extra plywood that I used for the new planks in Q-berth, I cut a new floor. I am happy to say that the electronic locker is SWEET now and ready for the instrument panel next. Thats enough about the wiring and electronics (full blog and video to come). The last thing I did while I was in this locker was remove a random piece of wood with 4 screws coming in from the outside where the sea wall is. I already noticed hairline cracks on the outside paint, but come to find out the previous owner put fairing compound over the screw heads and painted on top. There was already some water coming in where the cracks were, so I pushed the screws through, beveled out the 4 holes, put two layers of fiberglass and fairing compound on top all with Marissa’s help.  I still need to sand and paint, but I need to find the paint to match before I go forward. At least now there is no leaking and the problem is fixed on the inside so the Electronic Cabinet is done from the inside.

Lets go back to the Q-Berth building, FINALLY! To build the frame I went and bought some 2” by 1/2″ wood for the plywood to sit on top of. I screwed the 2″ by 1/2″ planks on 12 3/4″  above the lower bunk so the plywood sits perfectly level with the existing upper level of the Q-berth. Once the border was built I had to make some cross members to disperse the load. I made two cross members in total, the one further aft has two U shaped wood blocks that a wood beam is cradled in. I made the x-members removable so we can get into the lower storages easily. The 2nd x-member shares the same design using the u-shaped blocks but due to the plywood wall not having as much structural integrity side to side as compression, the x-member is still removable but two pins hold the crossmember in place so there is no side to side wobble.


 

The hardest part of this project was constructing a nav-seat/back rest. Although we wanted to raise the bed to the upper level, this area will still be used primarily as a nav-station so I needed to find a way to hide the ugly lip of the old upper level and the crossmember I built to give a more “factory” feel and look. After much, much thought I built a new backrest and armrest. The only way to make it look good like it belonged in our boat was to use teak. I did happen to have some teak saved from previous projects, but after using the big plank to finish the top of the backrest I bought some new  1″ 1/2” teak strips using a tongue and groove style to finish the job.


 

IMG_4342.JPG
Not too shabby pre-cut

The last step was to put a new mattress in. Instead of buying a custom mattress (which would be great) we decided to buy a latex foam mattress from amazon and cut it ourself. We did the same with our bed, and it worked really well. After measuring and remeasuring a few hundred times, I found that a queen size was the smallest we could go after making our cuts. I also found that using a very sharp cutting knife works perfectly for cutting the mattress. We have heard of people that use serrated knives, but with our experience they do an okay job but leave quite a mess. We used the old cushions and the new planks as templates for cutting. From there we cut a little off both long sides but kept the two narrow sides untouched. After we finished cutting we put the foam back into the sleeve and sure enough we cut it perfectly! In the future we plan to  sew on a cover that will match the blue pattern on the rest of our boats cushions so we don’t have to keep a set of sheets on the bed at all times to make it look good, but until then we will enjoy how snug it looks.

IMG_4357.JPG
Not a bad set up 🙂

As far as the project goes now, all we need to do is varnish the new teak, paint the plywood white just like the V berth, and make a custom blue cover for the mattress as well as the nav-seat. However, those are just details. We consider this project complete and we are so excited with how it turned out! We now have more storage for our guitars, video gear, and other misc. things that had no home until now.

 

Marissa’s parents were the first people to sleep in the new bed, and we finished the project within 20 minutes of their arrival- not bad if I do say so myself. They said that it was very comfortable and are excited to come visit again, we sure hope that our guests now have a better nights sleep when they stay aboard!

Thanks for reading, I hope you enjoy the full video recap below. Cheers, ~ Skipper Chris

 

 

 

 

 

Anonymous

Click here for full post: https://svavocet.com/2018/12/20/quarter-berth-refit/

Instagram: @svavocet

New Episode Posted – Slip Sailing and Bilge Painting

Beyond the Bahamas